Study notes
On this page
  1. Value without a market price
  2. Calculate travel-cost surplus
  3. Compare benefits with costs
  4. Exam methods and worked application
  5. Willingness to pay and marginal abatement cost

Session 1 · Environmental benefits and costs

Exam focus. Distinguish valuation methods, calculate net surplus, and assess a project with a consistent welfare boundary.

Value environmental changes and turn a demand curve into consumer surplus.

Value without a market price

Total economic value combines use, option and existence value. Contingent valuation asks respondents to state willingness to pay and can capture existence value, subject to survey bias. Travel cost uses observed trips and their implicit price to estimate recreational use value.

Calculate travel-cost surplus

CSi=Gi−ciqiCS_i = G_i - c_i q_i

For zone i, gross benefit G is the area under demand up to q trips and c is travel cost per trip. Multiply each zone’s per-person surplus by its population and sum.

Two zones

Zone A has €80 of gross benefit, 10 trips at €3 and 200 residents. Zone B has €45 gross benefit, 5 trips at €6 and 100 residents. Aggregate annual surplus = 200 × €50 + 100 × €15 = €11,500.

Compare benefits with costs

Engineering estimates track control expenditure. Social cost includes opportunity cost and may differ when regulation changes productivity, behavior or technology. For multi-year policies compare benefits and costs at a common base date.

Units and axes

Put visits on the horizontal axis and cost per visit on the vertical axis. Convert surplus per resident per year to total annual welfare only after calculating it for each zone.

Exam methods and worked application

Choose a valuation method

Contingent valuation can ask about protecting a site its respondents never visit. In the exam, identify hypothetical or strategic response bias. Travel cost infers recreation demand from behavior. Account for travel time when instructed and beware of trips with multiple purposes. A €14 gross willingness to pay and an €8 cost leave €6 of consumer surplus per trip in a discrete example. For a demand curve use the relevant area rather than multiplying the final willingness to pay by all trips.

Worked benefit–cost decision

A project costs €100 today and delivers €60 of benefits at the end of each of the next two years. At 5%, net present value is 60 ÷ 1.05 + 60 ÷ 1.05² − 100 ≈ €11.56. The measured benefits exceed costs under these assumptions. Explain whose costs are counted, any omitted nonmarket effects, and how a higher discount rate would change the estimate.

Willingness to pay and marginal abatement cost

Willingness to pay measures the benefit of an improvement to the person valuing it. For a discrete visit, surplus equals willingness to pay minus the full cost. For multiple visits with falling willingness to pay, use the area up to the relevant quantity. For pollution control, marginal abatement cost is the cost of cleaning up one more unit. Total abatement cost is the area under the MAC curve over the units cleaned up. With MAC = 2A, cleaning up four units costs 16 in total, while the marginal cost at four units is 8.

Session 1 slides.

Practice this chapter

Exam-ready review notes · pp. 2–3.