Session 1 · Resources and forecasting
Identify resources, capabilities and bottlenecks, then calculate and interpret short-run demand forecasts.
Resource, capability or constraint?
A resource is an asset or input the firm can deploy, such as a processing line, inventory or supplier relationship. A capability is the repeatable ability to organize resources, such as production scheduling. The resource-based view asks how resources and capabilities support competitive advantage. The theory of constraints asks which factor currently limits system performance. If processing capacity is 400 packs per day and demand is 500, more cold storage alone will not raise throughput while processing binds.
Read the demand pattern
A level is a baseline around which demand fluctuates. A trend is sustained movement. Seasonality is a recurring calendar pattern. Irregular variation is harder to predict. Demand, supply and process uncertainty can all affect how usable a forecast is. Identify the pattern before choosing a method.
Compare the main forecasts
| Method | Procedure | Interpretation |
|---|---|---|
| Naïve | Use the most recent actual as the next forecast | Fast response, sensitive to noise |
| Moving average | Average the latest n actuals | Larger n smooths more and reacts more slowly |
| Weighted moving average | Give each selected actual a weight, totaling one | Recent observations can receive more influence |
| Exponential smoothing | Next forecast = current forecast + α × current error | Higher α responds more to recent misses |
With latest actuals of 110, 130 and 120, a three-period moving average is 120. Weights of 0.2, 0.3 and 0.5 in chronological order give 121. If the current forecast was 115, current actual 120 and α = 0.4, the next smoothed forecast is 117. State the period being forecast and use only observations available at that point.
Practice this session